Why can't a new excavator work beyond its capacity for three months

Oct 31, 2025

The necessity of the running-in period: Although the engine, hydraulic pump, walking motor and other components of the new excavator have undergone precise processing during the manufacturing process, there are still microscopic unevenness on their surfaces. The function of the running-in period is to gradually smooth the surface of the components through light load operation, forming a more compatible working surface and reducing long-term wear.

Key points for protecting core components

Engine: The sealing performance between the piston rings and the cylinder wall of the new engine needs to be optimized through running-in. Premature high load may cause local overheating or abnormal wear.

Hydraulic system: The fit clearance between the hydraulic pump and the valve body needs to be gradually stabilized. Overloading may cause pressure fluctuations or excessively high oil temperature, accelerating the aging of sealing parts.

Structural components: The stress distribution of metal parts such as the boom and tracks needs to adapt to the actual working conditions. Sudden high-intensity operation may cause microcracks.

Operation suggestions

Load control: Avoid continuously exceeding 80% of the rated load for the first 200 hours. For example, do not work at full load for a long time during earthwork.
Speed management: It is recommended that the engine speed be controlled at 70% to 80% of the rated speed to avoid prolonged high-speed operation.

Working hours: It is recommended that the continuous operation time in a single day does not exceed 8 hours. Check the status of the engine oil and hydraulic oil every 50 hours of operation.

Environmental adaptation: In extreme temperatures (such as below -10℃ or above 40℃) or at high altitudes, the initial maintenance cycle needs to be further shortened.

Exception note: Some brands of modern excavators (such as Caterpillar and Komatsu) may shorten the running-in period requirements through a pre-running-in process, but it is still recommended to avoid extreme working conditions for the first 100 hours. For specific details, please refer to the "New Machine Running-in Specifications" in the equipment's "Operation and Maintenance Manual".

Summary: Moderate use of new excavators in the first three months is the key to preventive maintenance, which can reduce the early failure rate by more than 30%. It is recommended that users strictly follow the manufacturer's instructions and keep the first maintenance record as the basis for subsequent warranties.